CONTROL INSTRUMENTATION ELECTRIC POWER

Brand Owner (click to sort) Address Description
POWER FORMER ABB AB SE-721 71 VĂ„STERAS Sweden control instrumentation for electric power generation and utilization, namely, controllers, control stations, controllers for shutting down processes and equipment when operational parameters are exceeded;In the statement, column 1, lines 1 and 2, Patent (Sweden Corporation), Se-721 78 Vasteras, Sweden should be deleted, and, ABB AB (Sweden Corporation) Patent, SE-721 78 Vasteras, Sweden should be inserted.;high capacity electric generators for electric power plants, and parts therefor, electric motors, transmissions and couplings for machines, and parts therefor;
POWERFORMER ABB AB SE-721 71 VĂ„STERAS Sweden Control instrumentation for electric power generation and utilization, namely, controllers, control stations, controllers for shutting down processes and equipment when operational parameters are exceeded;High capacity electric generators for electric power plants, and parts therefor, electric motors, transmissions and couplings for machines, and parts therefor;POWER FORMER;
POWERFORMER Asea Brown Boveri 721 83 Vasteras Sweden Control instrumentation for electric power generation and utilization, namely, controllers, control stations, controllers for shutting down processes and equipment when operational parameters are exceeded;High capacity electric generators for electric power plants, and parts therefor, electric motors, transmissions and couplings for machines, and parts therefor;POWER FORMER;
 

Where the owner name is not linked, that owner no longer owns the brand

   
Technical Examples
  1. A coordination controller prevents the deterioration of electric power quality in an electric power system, such as in terms of voltage values, that can be caused when distributed power resources connected in parallel to the electric power system are operated without restrictions. A distributed power resource 103 includes means 112 for communicating with the outside of an electric power facility, means 116 for monitoring the current time, means 115 for synchronizing with the outside time, means 112 for receiving a control schedule for an electric power-consuming apparatus or electric power generating apparatus, and a coordination controller 101 for implementing the control schedule according to the time obtained by the time monitoring means 116.