BREWER ASSIST PRO POWER PROCEDURE

Brand Owner Address Description
BREWERASSISTPRO POWER PROCEDURE TABLE THE BREWER COMPANY N88 W13901 Main Street, Suite 100 Menomonee Falls WI 53051 BREWER ASSIST PRO POWER PROCEDURE TABLE;Patient examination and/or treatment tables;POWER PROCEDURE TABLE;
 

Where the owner name is not linked, that owner no longer owns the brand

   
Technical Examples
  1. A twin brewer system (30) with a pair of brewers (30A, 30B) each with a controller (158) for controlling the application of electrical power to a hot water heater, disables the application of electrical power to the heater (154) of one brewer (30A, 30B) in response to actuation of a start brew switch of the one brewer (30A, 30B) while electrical power is being applied to the heater (154) of the other brewer (30A, 30B). The controllers also respond to a hot water quantity sensor (164, 168) and a responsive delay circuit for disabling dispensing of hot water in response to actuation of the brew start switch (50) until a sufficient quantity of hot water is in a hot water dispenser tank (152) needed for the brew cycle. Indication lamps indicate when the brew cycle is being delayed and when brewing is not being performed. Actuation of a single emergency stop switch (138) stops hot water dispensing of both brewers (30A, 30B).