OIL WELL DRILLING COMPLETION

Brand Owner (click to sort) Address Description
FRACLOCK FHE USA 1597 Cipolla Road Fruita CO 81521 Oil well drilling and completion equipment, namely, remotely operable locking systems comprised primarily of a pipe coupling with remotely operable locks and a lock retaining ring used to attach and detach well service tools to a wellhead;FRAC LOCK;
POSI LOCK Lee Specialties Inc. 27312 - 68 TWP RD 394 Blackfalds, Alberta T0M0J0 Canada Oil well drilling and completion equipment, namely, remotely operable wellhead-connection systems comprised primarily of a metal pipe machine coupling with a remotely operable metal clamp used to attach and detach well service tools to a wellhead for use with a remote-control apparatus for locking and releasing the remotely operable metal clamp;LOCK;
RIGLOCK FHE USA 1597 Cipolla Road Fruita CO 81521 Oil well drilling and completion equipment, namely, remotely operable locking systems comprised primarily of a metal pipe coupling with remotely operable metal cam locks used to attach and detach well service tools to a wellhead, and also including a remote control apparatus for locking and unlocking the metal cam locks;RIG LOCK;
VANNSYSTEM HALLIBURTON ENERGY SERVICES, INC. 3000 N. Sam Houston Pkwy. E. Houston TX 77032 Oil Well Drilling and Completion Services;
VANNSYSTEM Vann; Roy R. P.O. Box 38 Artesia NM 88210 Oil Well Drilling and Completion Services;
 

Where the owner name is not linked, that owner no longer owns the brand

   
Technical Examples
  1. A process to determine optimal completion type and design prior to drilling of a hydrocarbon producing well utilizing information from hydrocarbon recovery modeling such as reservoir, geo-mechanical, and material modeling over the production life of the well. An embodiment of the process includes obtaining information regarding pore pressure depletion, stress magnitudes and orientations, and strength of rock formation from hydrocarbon recovery modeling to determine optimum well completion design including the selection of a completion type, trajectory, and location. Additionally, the process may also consider probable failure mechanisms and identified completion requirements, and their corresponding effect on completion options.